久久国产精品99久久久久,久久久久久一区二区三区四区别墅,国产精品久久久久久久久久久久午夜,亚洲性一区,亚洲国产精品成人综合色在线婷婷 ,久久91精品国产91久久,国产久

中文

Kunming Konggang Waste-to-Energy Plant Phase II Project Officially Signed


On May 20, the signing ceremony of Kunming Konggang Waste-to-Energy Plant Phase II Project was held at Sanfeng Environment Headquarters. Wei Qian, Deputy Secretary and Director of the Party Working Committee of the Kunming Konggang Economic Zone Management Committee, and the heads of relevant departments, Sanfeng Environment Party Committee Secretary and Director Chairman Lei Qinping, Deputy Secretary of the Party Committee and General Manager Wang Xiaojun, and Deputy General Manager Wang Jiahong attended and witnessed the signing ceremony.

image.png

The design processing capacity of the project is 800 tons/day. It adopts the process of total waste incineration + semi-dry and dry flue gas purification + residual sanitary landfill. It is equipped with a mechanical grate furnace of 800 tons/day and a 20MW medium temperature sub-high pressure steam turbine generator set. The franchise period is 30 years (including a 2-year construction period). Counting the Phase I project of Kunming Konggang Waste-to-Energy Plant that also invested and constructed by Sanfeng Environment (completed and put into operation in 2012) in, the processing scale of the Phase II project will reach 1,800 tons/ day, effectively guaranteeing the “reduction, recycling and harmlessness” treatment of local domestic waste, and fully meeting the needs of urban development.

After the signing ceremony, the two parties had in-depth discussions and exchanges on the project construction and further government-enterprise cooperation. Wei Qian expressed his gratitude and affirmation to Sanfeng Environment, and said that all bureaus of the management committee would fully cooperate to promote the construction of the second phase of the project. He also hoped that with the continuous development of the Konggang Economic Zone, the two sides could cooperate in other projects such as medical waste treatment and further broaden the scope of cooperation between the two parties.

image.png

Before the signing ceremony, Wei Qian and his delegation also visited the manufacturing base and operation control center of Sanfeng Environmental Headquarters, and spoke highly of Sanfeng Environment equipment manufacturing and intelligent management and control.


Address: 3 Jianqiao Avenue, Jianqiao Industrial Park, Dadukou District, Chongqing, China Tel:(+86) 8805 5666

Chongqing Sanfeng Environment Group Corp. Ltd. All Rights Reserved 渝ICP備50010402000216號

丘北县| 铜陵市| 灯塔市| 麻阳| 城市| 沾益县| 若尔盖县| 峨边| 青海省| 龙井市| 龙州县| 赤水市| 南昌县| 东乡县| 昌吉市| 阆中市| 平果县| 兴化市| 同仁县| 锡林浩特市| 休宁县| 民乐县| 江城| 万荣县| 辉南县| 峨眉山市| 长顺县| 崇明县| 文昌市| 浦江县| 金门县| 酒泉市| 阜康市| 将乐县| 苏州市| 旅游| 肇东市| 龙井市| 突泉县| 巴楚县| 广安市|